Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a2777c9b1eb8c6f8

Jump to content

// Workers AI · dad joke modeWhat did Ammann & Whitney bridge say? "Let's connect.

From Wikipedia, the free encyclopedia
(Redirected from Ammann and Whitney)
Ammann & Whitney
TypePrivate
IndustryStructural engineering
Founded1946
Key people
Othmar Herrmann Ammann,
Nick Ivanoff
Number of employees
250
Website

Ammann & Whitney was a full-service civil engineering firm that provided design and construction services for public and private sector projects. The firm provided new construction, renovations, adaptive reuse, historic preservation, interior design and sustainable design.

In 2016, Ammann & Whitney merged with Louis Berger to form Louis Berger U.S.[1]

History

[edit]

Ammann & Whitney was founded in 1946 by Othmar Ammann, a bridge designer, and Charles S. Whitney, a designer of innovative structures. Whitney's innovations include collaborations with Eero Saarinen on early thin-shell concrete structures such as Kresge Auditorium (1955), TWA Flight Center (1962), and the main terminal at Dulles International Airport (1962).[2]

Ammann & Whitney has since grown into an international firm. While working with a wide variety of projects including (steel, concrete, masonry and timber) bridges for vehicular, pedestrian and rail traffic, Ammann & Whitney focuses on long span suspension bridges. Examples of the firm's bridge work include the Delaware Memorial Bridge, Walt Whitman Bridge, the General Belgrano Bridge in Argentina, the Throgs Neck Bridge and most notably the Verrazzano–Narrows Bridge.[3]

In July 2016, Ammann & Whitney merged with Louis Berger.[1] It is now Berger's long-span bridge division.[4]

Ammann & Whitney currently has offices on the East Coast of the United States and its headquarters in New York City. There are branch offices in Boston, MA, Philadelphia, PA, Pittsburgh, PA, Richmond, VA, Miami, FL, and Washington, D.C.

Bridge and Highway Projects

[edit]

New York City

Elsewhere

Projects

[edit]

Ammann & Whitney projects included:[5]

References

[edit]
  1. 1 2 "Louis Berger merges two operating companies to form a new U.S. operation". Louis Berger. July 5, 2016. Retrieved December 30, 2017.
  2. Whitehead, Rob (2014). "Saarinen's shells: The evolution of engineering influence". Iowa State University Digital Repository: 84. Retrieved 4 November 2018.
  3. "Ammann & Whitney Official Website". Archived from the original on 2006-02-03. Retrieved 2008-10-23.
  4. "Ammann & Whitney merger". Louis Berger. Retrieved December 30, 2017.
  5. "Ammann & Whitney". International Database for Civil and Structural Engineering.
[edit]