Edge Rewrite
// HTMLRewriter · presentation

This page was redesigned at the edge.

Cloudflare fetched the original article and streamed it through HTMLRewriter to apply an entirely new visual system without rebuilding the source page.

// request.cf · coarse context

A page that knows where it met you.

Only coarse request metadata is shown. This demo does not display or persist visitor IP addresses.

Country
US
Cloudflare location
CMH
Connection
HTTP/2
Language
Not provided

Ray ID: a25bb6100ac5994c

Jump to content

// Workers AI · dad joke modeWhat did the Ambala–Chandigarh Expressway say? "I'm always express-ing myself.

From Wikipedia, the free encyclopedia

Ambala Chandigarh Expressway
Route information
Length35 km (22 mi)
Major junctions
West endAmbala
East endChandigarh
Location
CountryIndia
StatesHaryana, Punjab
Highway system

Ambala Chandigarh Expressway is four-lane 35 km long,[1] high-traffic density corridor of Ambala-Chandigarh section (km 5.735 to km 39.960 on NH-152 and 0 km to 0.871 km on NH 5) on BOT basis, was completed in 30 months at a cost of 2.98 billion (US$31 million)[2] The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank.

38 km south of Ambala at existing NH152 (Ambala-Pehowa-Narwana-Fatehabad-Sirsa), it connects with the controlled access tolled Ambala–Narnaul Expressway (Trans-Haryana Expressway).

See also

[edit]

References

[edit]
  1. "Roads-GMR Ambala-Chandigarh Expressways Private Limited". Gmrgroup.in. Archived from the original on 21 July 2011. Retrieved 26 July 2010.
  2. "In fast lane, NHAI inks pact to widen Chandigarh section". Financialexpress.com. 19 November 2005. Retrieved 19 August 2010.